NLS Contractors

MEP Packages

An MEP package covers mechanical, electrical and plumbing works, usually with fire protection and controls. NLS Contractors installs MEP packages for Saudi buildings as one coordinated scope: shop drawing coordination, first and second fix, testing, commissioning and handover, priced from the BOQ by trade.

MEP stands for mechanical, electrical and plumbing, and on most Saudi buildings it also carries fire protection and controls. These trades share the same ceiling voids, risers and plant rooms, so their drawings have to be coordinated before any pipe, duct or tray is fixed. The coordinated shop drawing is the real deliverable of the first month.

Work then runs in two fixes. First fix is the containment, pipework, ductwork and cable pulling behind finishes. Second fix is the devices, fixtures, luminaires, grilles, panels and terminations. Between and after them sit the tests: pressure tests, insulation resistance and earth loop checks, leakage tests, flushing, and the Civil Defense acceptance of the fire systems under SBC 801.

Commissioning is where the package proves itself. TAB balances air and water to design, the BMS sequences are tested, and on hospitals and towers an integrated systems test runs everything together: a fire alarm event that should shut dampers, release doors, start the fans and call the lifts. Each system can pass on its own and the building can still fail that test, which is why it appears in the programme.

NLS Contractors prices MEP either as one package or by trade, always with the trades shown as separate sections so each can be compared with the tender. Equipment can be supplied by the client or by NLS Power, with installation in the same offer, and controls sit with the BMS package.

Send the MEP drawings, schedules, specification, BOQ, and the programme with the site city. The offer states the coordination deliverables it carries and the testing it includes.

Related services

Related products

BMS Installation Works

BMS installation works cover field sensors and actuators, DDC panels, the controller network, the supervisory server and workstation, plus cabling and containment, priced from the point list. Built to ISO 16484 and BACnet (ASHRAE 135) in Riyadh, Jeddah, Dammam and Khobar, with shop drawings, I/O schedules, test records, controller backups and O&M manuals at handover.

LV Power Distribution Installation

LV power distribution installation covers main, sub-main and final distribution boards, cable tray, trunking, conduit, cables, terminations and earthing. Work follows SBC 401, IEC 60364 and IEC 61439 for assemblies, with SEC requirements on grid connections, in Riyadh, Jeddah, Dammam and Khobar. Handover includes single line diagrams, test certificates, labelling schedules and as-builts.

Split, VRF & Packaged AC Installation

NLS Contractors installs split, VRF and packaged air conditioning in Riyadh, Jeddah, Dammam and Khobar and across the Kingdom. Scope covers indoor and outdoor units, refrigerant piping tested under pressure and vacuum, condensate drains, control wiring and power connection, to SBC 501 and SBC 601. Handover includes piping layouts, test records, commissioning sheets and as-builts.

Sprinkler, Hydrant & Fire Pump Installation

NLS Contractors installs sprinkler, hydrant and fire pump systems in Riyadh, Jeddah, Dammam and Khobar and across the Kingdom: sprinkler grids, risers and standpipes, hydrants, hose cabinets and pump sets with fire water tank connections. Work follows NFPA 13, 14, 20 and 24 and SBC 801, with Civil Defense acceptance support and test certificates at handover.

Cold & Hot Water Supply Piping

NLS Contractors installs cold and hot water supply piping in Riyadh, Jeddah, Dammam and Khobar and across the Kingdom: risers, branches, valves, insulation and water heaters, in PPR to ISO 15874, copper, stainless steel or HDPE to ISO 4427. Work follows SBC 701, with pressure tests, flushing and disinfection certificates in the handover.

Frequently Asked Questions

What does MEP stand for and what does the package include?+

Mechanical, electrical and plumbing. On most Saudi buildings the package also includes fire protection and controls, from coordinated shop drawings to testing, commissioning and handover.

Do you take MEP as one package or by trade?+

Either. A single package gives one point of responsibility, and a by-trade offer lets a main contractor split the work. Both show each trade as its own section.

What is an integrated systems test?+

A test that runs the building's systems together, such as a fire alarm event that must shut dampers, release doors, start fans and call lifts. It is common on hospitals and towers and sits in the programme.

Can the equipment come from NLS Power?+

Yes. Switchgear, UPS, generators, HVAC and fire equipment can be supplied by NLS Power with the installation priced in the same offer, or the client can supply the equipment.

Get in touch

Send us your RFQ

Tell us what you need and we will come back with pricing and lead times.

+966 53 590 8101