Cold & Hot Water Supply Piping (Plumbing Contractor)
Also called: plumbing contractor, plumbing works, PPR pipe installation, water pipe installation, MEP plumbing works
NLS Contractors installs cold and hot water supply piping in Riyadh, Jeddah, Dammam and Khobar and across the Kingdom: risers, branches, valves, insulation and water heaters, in PPR to ISO 15874, copper, stainless steel or HDPE to ISO 4427. Work follows SBC 701, with pressure tests, flushing and disinfection certificates in the handover.
Water supply is the plumbing system a building cannot do without and cannot easily repair. Most of it ends up behind walls and above ceilings, so it has to be right before it is covered. The scope is the risers, branches to each fixture or room, isolation valves, insulation on hot lines, and the water heaters.
Inside buildings the usual pipe is PPR made to ISO 15874 and joined by heat fusion. The specification may call for copper or stainless steel in particular areas, and HDPE to ISO 4427 is the usual choice for buried or larger-diameter runs. PPR expands noticeably when hot, so hot lines need loops, guides and fixed points as the drawings set them.
Hot water adds insulation, expansion provisions and often a return circuit, so a tap far from the heater does not run cold for a minute. Cold lines in shafts and on roofs are insulated too, since water in a pipe exposed to a Riyadh summer arrives warm. Water heaters are installed with isolation valves, relief valves and drain points, to the manufacturer's instructions.
Every system is tested before it is covered. A hydrostatic pressure test at the pressure and duration the specification states proves the joints, and the record is signed. The system is then flushed and disinfected before use, and for potable systems a water sample goes to a laboratory where the specification asks. The disinfection certificate goes into the handover file.
SBC 701 sets the sanitary and plumbing requirements, and the project specification sets pipe class, pressure rating and the test regime. Where a project connects to the public water network, the connection follows the water authority's conditions. Price depends on pipe material and diameters, total length, the number of fixtures served, insulation and heater type. Lead time depends on scope and the offer states it. Send the plumbing drawings, riser diagrams, fixture schedule, specification, BOQ and the site city.
Specifications
- ✓Pipe: PPR to ISO 15874, copper, stainless steel or HDPE to ISO 4427
- ✓Components: risers, branches, isolation valves, insulation, water heaters
- ✓Standards: SBC 701 and the project specification
- ✓Tests: hydrostatic pressure test, flushing, disinfection before use
- ✓Handover: riser diagrams, pressure test records, disinfection certificates, as-builts
Frequently Asked Questions
Is PPR suitable for hot water in Saudi buildings?+
Yes, in the pipe series chosen for the temperature and pressure, with expansion accommodated by loops and guides. The consultant's specification names the class and the offer prices that class.
How is a potable water system disinfected?+
It is flushed, filled with chlorine at the concentration and contact time the specification sets, flushed again, and sampled where required. The certificate is recorded in the handover file.
Do you install water heaters that the client supplies?+
Yes. Installation of client-supplied heaters, with isolation valves, relief valves, drain points and connections, is a normal scope.
Are connections to the public water network included?+
The connection point and conditions follow the water authority's requirements. The offer states whether the connection works are in scope or carried out by the authority.
Is NLS Contractors a plumbing contractor in Saudi Arabia?+
NLS Contractors takes plumbing as a works package, starting with cold and hot water supply piping in PPR, copper, stainless steel or HDPE, with valves, insulation and water heaters, to SBC 701. It is priced from the BOQ and built from specialist installer and supplier quotes. Pressure tests, flushing and disinfection certificates are part of handover.
Who supplies Cold & Hot Water Supply Piping (Plumbing Contractor) in Saudi Arabia?+
NLS Contractors (Northlane Solutions Company) supplies Cold & Hot Water Supply Piping (Plumbing Contractor) across Saudi Arabia, including Riyadh, Jeddah, Dammam and Jubail. Send your specification and quantities to info@nlscontractors.com or info@northlanesolution.com for a quotation.
Related products

Sanitary Drainage & Sewerage Piping
NLS Contractors installs sanitary drainage and sewerage piping in Riyadh, Jeddah, Dammam and Khobar and across the Kingdom: soil, waste and vent stacks in uPVC or HDPE, floor drains, cleanouts, manholes and the connection to the public sewer. Work follows SBC 701 and National Water Company requirements, with test records, invert levels and as-builts at handover.

Sanitary Fixtures & Fittings Installation
NLS Contractors installs sanitary fixtures and fittings in Riyadh, Jeddah, Dammam and Khobar and across the Kingdom: WCs, basins, urinals, showers, taps, bidet sprays, ablution points and accessible fixtures, supplied by the client or procured to the schedule. Mounting heights, supports and sealing are checked room by room, with accessible fixtures to SBC 201.

Water Tanks & Booster Pump Sets
NLS Contractors installs water storage tanks and booster pump sets in Riyadh, Jeddah, Dammam and Khobar and across the Kingdom: GRP, concrete or steel tanks, transfer pumps, VFD booster sets in duty and standby, level controls and chlorination points. Work follows SBC 701 and the pump maker's requirements, with disinfection and pump test records at handover.

Rainwater & Roof Drainage
NLS Contractors installs rainwater and roof drainage in Riyadh, Jeddah, Dammam and Khobar and across the Kingdom: roof drains, downpipes, gutters, overflow outlets and the connection to the storm network. Sizing follows the rainfall intensity the consultant sets, under SBC 701. Handover includes roof drainage layouts, water test records and as-builts.