NLS Contractors

HVAC & Mechanical Works

NLS Contractors installs HVAC and mechanical packages on Saudi projects: split, VRF and packaged units, chilled water plant and piping, ductwork and ventilation, sprinkler and fire pump systems, then testing, balancing and commissioning. Work follows SBC 501, SMACNA, NFPA 13 and NFPA 20, with Civil Defense acceptance support.

Mechanical packages are sold by system and judged by how they run in July. The system choice comes first. Split and VRF units suit offices, clinics and retail, packaged units serve roofs and warehouses, and chilled water plant with AHUs and FCUs serves hospitals, towers and campuses. SBC 501 is the mechanical code, SBC 601 sets the energy conservation requirements, and the consultant's specification fills in the rest.

Installation quality is measurable. Refrigerant piping is brazed under nitrogen, then pressure and vacuum tested. Chilled water pipework to ASME B31.9 is hydrostatically tested, flushed and dosed before any coil sees water. Ductwork follows SMACNA construction classes and is leak tested to the specified class. Fire and smoke dampers carry NFPA 90A requirements and, where smoke control is specified, NFPA 92. Insulation and vapour barriers matter more on the Red Sea coast, where humidity drives condensation.

Firefighting pipework belongs in the same trade. Sprinkler grids to NFPA 13, standpipes to NFPA 14, underground fire mains to NFPA 24 and pump sets to NFPA 20 are laid out against the hydraulic calculations, tested, and presented to Civil Defense for acceptance under SBC 801. A pump set that fails its flow test holds up the occupancy certificate, so the test is planned early.

Testing, adjusting and balancing is the step that makes a system match its drawings. A TAB agency working to NEBB or AABC procedures measures airflow and water flow at every terminal, adjusts to design values and issues a report. Commissioning to ASHRAE Guideline 0 then runs the functional tests, together with the BMS where one is installed.

Equipment can come from the HVAC and fire ranges at NLS Power, with installation priced in the same offer. A usable enquiry carries the mechanical drawings, equipment schedules, specification, BOQ and programme dates, plus the plant room layout for VRF or chilled water systems.

Related products

Split, VRF & Packaged AC Installation

NLS Contractors installs split, VRF and packaged air conditioning in Riyadh, Jeddah, Dammam and Khobar and across the Kingdom. Scope covers indoor and outdoor units, refrigerant piping tested under pressure and vacuum, condensate drains, control wiring and power connection, to SBC 501 and SBC 601. Handover includes piping layouts, test records, commissioning sheets and as-builts.

Chilled Water Piping & Plant Rooms

NLS Contractors installs chilled water piping and plant rooms in Riyadh, Jeddah, Dammam and Khobar: chillers, pumps, heat exchangers and cooling towers where used, with carbon steel or HDPE pipework, valves, insulation and vibration isolation. Piping follows ASME B31.9 and SBC 501. Handover includes isometrics, test records, flushing certificates and as-builts.

Ductwork & Ventilation Installation

NLS Contractors installs ductwork and ventilation in Riyadh, Jeddah, Dammam and Khobar: galvanised and pre-insulated duct, fire and smoke dampers, grilles and diffusers, AHUs, fans, kitchen and toilet extract, and stair pressurisation fans. Work follows SMACNA, NFPA 90A and SBC 501, with leakage and damper tests recorded for handover.

Sprinkler, Hydrant & Fire Pump Installation

NLS Contractors installs sprinkler, hydrant and fire pump systems in Riyadh, Jeddah, Dammam and Khobar and across the Kingdom: sprinkler grids, risers and standpipes, hydrants, hose cabinets and pump sets with fire water tank connections. Work follows NFPA 13, 14, 20 and 24 and SBC 801, with Civil Defense acceptance support and test certificates at handover.

Testing, Adjusting & Balancing (TAB) and HVAC Commissioning

NLS Contractors delivers testing, adjusting and balancing (TAB) and HVAC commissioning as a works package in Riyadh, Jeddah, Dammam and Khobar: airflow and water flow measurement, balancing to design values and functional testing, using NEBB or AABC procedures as specified and ASHRAE Guideline 0. Handover includes TAB reports, balancing sheets, functional test records and a commissioning report.

Frequently Asked Questions

Should a building use VRF or chilled water?+

VRF suits small to medium buildings with varied zones and no central plant. Chilled water suits large buildings, hospitals and campuses where plant efficiency, redundancy and long runs count. The consultant's design decides, and the contractor prices what is drawn.

What is TAB and who carries it out?+

Testing, adjusting and balancing. A TAB agency working to NEBB or AABC procedures measures airflow and water flow at every terminal and adjusts the system to the design values, then issues a signed report.

What does Civil Defense check on a sprinkler system?+

The design against the code, then the hydrostatic test and the pump flow test before the building is accepted. The contractor presents shop drawings, hydraulic calculations and test records.

What do you need to price an HVAC package?+

The mechanical drawings, equipment schedules, specification and BOQ, plus the programme dates and the city. For VRF or chilled water, the plant room layout as well.

Get in touch

Send us your RFQ

Tell us what you need and we will come back with pricing and lead times.

+966 53 590 8101