NLS Contractors

Healthcare Facility Works

NLS Contractors takes building systems and finishing packages for Saudi hospitals and clinics: BMS, rooftop helipads, HVAC and pressure control, fire alarm, plumbing and clinical fit-out. Work follows NFPA 99, ASHRAE 170 and SBC 801, and ends with staged handover so the facility can open in phases.

A hospital is several buildings in one. The clinical areas have strict air and pressure rules, the plant has to run without interruption, patients and visitors need clear escape routes, and the helicopter that brings a trauma case has to land on a roof that was designed for it. Packages are let by trade, and each trade has to respect the others' constraints.

Building controls come first. A hospital BMS logs temperature, humidity and room pressure for theatres, wards and isolation rooms, runs the AHU sequences that hold pressure cascades, and receives medical gas and essential power alarms as monitored points. ASHRAE 170 sets ventilation for health care facilities, and NFPA 99 covers medical gas and essential electrical systems. Commissioning is phased building by building.

A rooftop helipad is a structural, fire and aviation package at once. The roof is checked for helicopter loads, the TLOF is surfaced and marked, lighting and a wind direction indicator go in, and firefighting water reaches the roof. GACA approval belongs to the owner, and the construction documents support it.

Fire alarm and sprinkler systems go through Civil Defense acceptance. Plumbing includes clinical fixtures, hot water circulation and disinfection of the supply. Fit-out uses hygienic finishes, with infection control during works and staged handover.

NLS already supplies hospital infrastructure projects in Saudi Arabia, and NLS Power's range covers isolated power panels, UPS and generators for this kind of building. Send the drawings, the BOQ, the infection control requirements and the phasing plan with the site city.

Related services

Building Controls & BMS Installation

NLS Contractors installs building management systems and DDC controls on Saudi projects: field devices, controllers, network, graphics, integration, testing and handover. A package is priced from the point list or BOQ and built to ISO 16484 and BACnet (ASHRAE 135), for hospitals, campuses, towers and plants in Riyadh, Jeddah and the Eastern Province.

Helipad & Heliport Construction

NLS Contractors builds ground-level helipads, hospital rooftop helipads and elevated helidecks in Saudi Arabia: structure, surfacing, markings, lighting, drainage and firefighting provisions, built to the issued drawings and checked against GACAR Part 138 and ICAO Annex 14 Volume II. Construction documents are prepared to support the owner's GACA submission.

Electrical, Lighting & ELV Installation

NLS Contractors installs LV power distribution, lighting, emergency and central battery lighting, fire alarm, structured cabling and ELV systems on Saudi projects. Work follows SBC 401, IEC 60364 and NFPA 72, with test certificates, Civil Defense inspection support and as-built drawings at handover.

HVAC & Mechanical Works

NLS Contractors installs HVAC and mechanical packages on Saudi projects: split, VRF and packaged units, chilled water plant and piping, ductwork and ventilation, sprinkler and fire pump systems, then testing, balancing and commissioning. Work follows SBC 501, SMACNA, NFPA 13 and NFPA 20, with Civil Defense acceptance support.

Plumbing & Drainage

NLS Contractors installs plumbing and drainage packages on Saudi projects: cold and hot water supply, sanitary drainage, fixtures, water tanks, booster pump sets and roof drainage. Work follows SBC 701 and the project specification, with pressure tests, disinfection certificates and as-built drawings at handover.

Fit-Out & Finishing

NLS Contractors delivers commercial, healthcare, retail and hospitality fit-out in Saudi Arabia: partitions, ceilings, flooring, painting, doors and glazing, coordinated with the MEP trades. Fire ratings follow SBC 801, ventilation in clinical areas follows ASHRAE 170, and each job closes with a snag list, as-builts and O&M documents.

Related products

BMS for Hospitals & Healthcare Campuses

BMS for hospitals and healthcare campuses covers central plant and the AHUs serving theatres, wards and isolation rooms, with room pressure, temperature and humidity monitoring. Built to ISO 16484 with ASHRAE 170 and NFPA 99 monitoring points across Riyadh, Jeddah and the Eastern Province, with building-by-building handover, alarm schedules, trend logs and test records.

Fire Alarm System Installation

Fire alarm installation covers the addressable panel, detectors, manual call points, sounders, interface modules, fire-rated cabling, and interfaces to the BMS, door holders, HVAC shutdown and lifts. Work follows NFPA 72 and SBC 801, with Civil Defense approval of the design and the acceptance test, in Riyadh, Jeddah, Dammam and Khobar. Handover includes loop drawings and a cause-and-effect matrix.

Healthcare & Clinic Fit-Out

NLS Contractors fits out clinics, day-surgery units and laboratories in Riyadh, Jeddah, Dammam, Khobar and across the Kingdom, with hygienic finishes, ventilation coordinated to ASHRAE 170, NFPA 99 services and SBC 801 fire protection. Works are staged so the facility opens in phases. Handover includes a finishes schedule, services test records and as-builts.

Hospital Rooftop Helipads

Hospital rooftop helipad construction covers the structural interface to the roof slab or frame, the TLOF surface, safety net, access route to the emergency department, lighting and firefighting provisions. Built to GACAR Part 138, ICAO Annex 14 Volume II, NFPA 418 and Civil Defense requirements in Riyadh, Jeddah, Dammam and Khobar, with load path documentation and a handover pack.

Testing, Adjusting & Balancing (TAB) and HVAC Commissioning

NLS Contractors delivers testing, adjusting and balancing (TAB) and HVAC commissioning as a works package in Riyadh, Jeddah, Dammam and Khobar: airflow and water flow measurement, balancing to design values and functional testing, using NEBB or AABC procedures as specified and ASHRAE Guideline 0. Handover includes TAB reports, balancing sheets, functional test records and a commissioning report.

Frequently Asked Questions

Which standards apply to hospital building systems?+

ASHRAE 170 for ventilation of health care facilities, NFPA 99 for medical gas and essential electrical systems, NFPA 72 and SBC 801 for fire alarm and fire protection, plus the consultant's specification.

What does a hospital BMS monitor?+

Temperature, humidity and pressure in clinical rooms, AHU and chiller status, and alarms from medical gas and essential power systems. Trend logs support infection control audits.

Can work continue while the hospital operates?+

Yes, with infection control measures, ceiling and dust barriers, out-of-hours work for noisy tasks, and a phasing plan agreed with the facility team. State the phasing in the enquiry.

Do you handle the helipad as well as the building systems?+

Yes. The rooftop helipad can sit in the same offer as the BMS, fire and finishing packages, with the owner holding the GACA approval.

Get in touch

Send us your RFQ

Tell us what you need and we will come back with pricing and lead times.

+966 53 590 8101