Healthcare & Clinic Fit-Out
NLS Contractors fits out clinics, day-surgery units and laboratories in Riyadh, Jeddah, Dammam, Khobar and across the Kingdom, with hygienic finishes, ventilation coordinated to ASHRAE 170, NFPA 99 services and SBC 801 fire protection. Works are staged so the facility opens in phases. Handover includes a finishes schedule, services test records and as-builts.
A healthcare fit-out is a fit-out with a rulebook. Clinics, day-surgery units and laboratories need finishes that can be cleaned, services that stay within defined limits, and a build process that does not put patients at risk. The package covers partitions, ceilings, flooring, wall protection, joinery, doors, painting and the coordination of the services around them.
Finishes are chosen to be cleaned. Floors are welded-seam vinyl or monolithic epoxy, so there are no open joints for dirt, with coved skirtings at the wall. Corridors where trolleys run get wall protection rails and sheet, clean rooms get sealed ceilings, and paint is smooth and cleanable. The consultant's finishes schedule names each room type, and the offer prices it room by room.
Services set the room. Ventilation to ASHRAE 170 fixes air changes, filtration and pressure relationships by room type, and the fit-out builds the ceiling, the grille openings and the room sealing so the HVAC package can balance them. NFPA 99 governs medical gas and the essential electrical system, and isolated power panels in theatres and procedure rooms must be coordinated with the ceiling and wall plan. SBC 201 and SBC 801 set the fire ratings and compartmentation. The services packages test and commission their own systems, and the fit-out coordinates access and sequence around those tests.
Infection control is part of the programme. Work beside an operating facility uses hoarding, dust and air control, sealed routes for waste and people, and cleaning between phases, all agreed with the facility's infection control team before work starts. Staged handover releases rooms or wings in sequence, each with its test records and a closed snag list, so the facility opens in phases and not on one day.
Send the architectural drawings, the room data sheets, the finishes schedule, the MEP and medical gas drawings, the infection control requirements, the phasing plan and the site city. Handover documents are the finishes schedule, the test and commissioning records for the services, and the as-builts. Price and lead time depend on the scope, and the offer states both.
Specifications
- ✓Scope: clinics, day-surgery units and laboratories
- ✓Finishes: welded-seam vinyl or monolithic epoxy floors, wall protection and cleanable paint
- ✓Services: ASHRAE 170 ventilation, NFPA 99 medical gas and isolated power coordination
- ✓Fire ratings and compartmentation per SBC 201 and SBC 801
- ✓Infection control during construction and staged handover
- ✓Handover: finishes schedule, services test and commissioning records, as-builts
Frequently Asked Questions
What floors are used in clinics and operating areas?+
Welded-seam sheet vinyl or monolithic epoxy, both without open joints, with coved skirtings at the wall. The room data sheet and the finishes schedule name the floor for each room type.
How is infection control handled during construction?+
With hoarding, dust and air control, sealed routes for waste and people, and cleaning between phases, agreed with the facility's infection control team before work starts.
Can a clinic open before every room is finished?+
Yes. Staged handover releases rooms or wings in sequence, each with its test records and a closed snag list, so the facility can open in phases.
Who tests medical gas and ventilation?+
The services packages test and commission them to NFPA 99 and ASHRAE 170 as specified, with witnessed records. The fit-out coordinates access, sealing and sequence around those tests.
Who supplies Healthcare & Clinic Fit-Out in Saudi Arabia?+
NLS Contractors (Northlane Solutions Company) supplies Healthcare & Clinic Fit-Out across Saudi Arabia, including Riyadh, Jeddah, Dammam and Jubail. Send your specification and quantities to info@nlscontractors.com or info@northlanesolution.com for a quotation.
Related products

Retail & Hospitality Fit-Out
NLS Contractors fits out stores, restaurants, hotel rooms and lobbies in Riyadh, Jeddah, Dammam, Khobar and across the Kingdom, with joinery, feature ceilings, kitchen extract coordination and signage. Work follows mall design guidelines and Civil Defense inspection before opening. Handover includes shop drawings, mock-up approvals and a closed snag list.

Partitions, Ceilings & Flooring
NLS Contractors installs gypsum board partitions, fire-rated and acoustic partitions, suspended ceilings and flooring in Riyadh, Jeddah, Dammam, Khobar and across the Kingdom. Board follows ASTM C1396 on ASTM C645 framing, and fire and acoustic ratings come from the specification and SBC 801. Handover includes data sheets, installation records and a closed snag list.

Painting & Wall Finishes
NLS Contractors applies plaster, putty, primer, emulsion and epoxy paint, wallpaper and feature finishes inside, and weather coatings outside, in Riyadh, Jeddah, Dammam, Khobar and across the Kingdom. Surface preparation, dry film thickness and colour approvals are recorded. Handover includes a paint schedule, product data sheets and a closed snag list.

Doors, Windows & Glazing Installation
NLS Contractors installs aluminium windows and curtain wall, steel doors, fire-rated door sets and glazing in Riyadh, Jeddah, Dammam, Khobar and across the Kingdom. Wind loads follow SBC 301, glazing thermal values are checked against SBC 601, and handover includes shop drawings, test certificates and installation records.

Commercial Office Fit-Out
NLS Contractors fits out commercial offices in Riyadh, Jeddah, Dammam and Khobar from shell and core to occupied floor: partitions, ceilings, flooring, joinery, glazing and MEP alterations. Egress and fire ratings follow SBC 201 and SBC 801, and handover includes shop drawings, a closed snag list, as-builts and O&M manuals.