NLS Contractors installs underground utilities in Riyadh, Jeddah, Dammam, Khobar and across the Kingdom: trenching, bedding, pipe laying for storm, sewer, water and fire mains, duct banks, manholes, chambers and backfill. Pipes are tested by type, and handover includes pipe test records, an invert level schedule and as-builts.

Underground work is the part of a site that gets buried, so the records matter as much as the pipe. Scope covers trench excavation and support, bedding and surround, pipe laying to line and level, jointing, manholes and chambers, duct banks for electrical and telecom cables, backfill in compacted layers and reinstatement. The networks are storm drainage, sewer, potable water and fire mains.

Pipe material follows the specification and the authority. HDPE is common for pressure mains and some drainage, GRP for larger diameters, and ductile iron where pressure, traffic load or fire mains call for it. Each material has its own jointing method and its own test, and the offer names the material it priced.

Tests follow pipe type. Pressure mains get a hydrostatic pressure test before the trench is closed. Gravity sewers and storm lines are tested for leakage and checked for line and level. Fire mains are tested to the pressure the consultant and Civil Defense specify. Each test is recorded and signed with the consultant, because a pipe cannot be inspected once it is backfilled.

Levels decide whether a gravity line works. Invert levels are set out from the drainage drawings and surveyed after laying, and the invert level schedule is part of the handover. On sabkha and high water table sites the trench needs dewatering and support while pipe is laid. In rock or basalt, trenching becomes breaking and the offer states the allowance.

Existing services are located before digging, from trial holes and the utility owner's records, and routes are adjusted at crossings. Roads, kerbs and paving cut for trenches are reinstated to the original specification, and backfill under roads is compacted in layers to the density the road specification sets.

Where the project joins a public network, the connection follows the owning authority's requirements, for example the National Water Company for water and sewer. To price the package, send the utility layout drawings, the longitudinal sections with inverts, the pipe schedule and material, the BOQ, the geotechnical report, the site city and the programme.

Specifications

  • ✓Networks: storm, sewer, water and fire mains, duct banks, manholes and chambers
  • ✓Pipe materials: HDPE, GRP and ductile iron, jointed by the method each material needs
  • ✓Testing: pressure tests on mains and leakage tests on gravity lines, per pipe type
  • ✓Levels: invert levels surveyed after laying and issued as a schedule
  • ✓Authority connections follow the owning authority's requirements
  • ✓Handover: pipe test records, invert level schedule, as-builts

Frequently Asked Questions

Which pipe material is used for storm and sewer lines?+

The specification decides. HDPE, GRP and ductile iron are all used, and the choice depends on diameter, pressure or traffic load, ground conditions and the authority's approved list. The offer names the material it priced.

How are buried pipes tested?+

By type. Pressure mains get a hydrostatic pressure test before the trench is closed, and gravity lines get a leakage test and a line and level check. Records are signed with the consultant.

Who approves a connection to the public network?+

The owning authority, for example the National Water Company for water and sewer. The connection follows its requirements and runs through the consultant.

What changes in trenching on a high water table site?+

Dewatering and trench support are added, so the trench stays stable while pipe is laid and bedding is placed. The offer states the method assumed and the discharge route.

Who supplies Underground Utilities & Trenching in Saudi Arabia?+

NLS Contractors (Northlane Solutions Company) supplies Underground Utilities & Trenching across Saudi Arabia, including Riyadh, Jeddah, Dammam and Jubail. Send your specification and quantities to info@nlscontractors.com or info@northlanesolution.com for a quotation.

Related products

Boundary Walls & Retaining Structures

Boundary Walls & Retaining Structures

NLS Contractors builds boundary walls and retaining structures in Riyadh, Jeddah, Dammam, Khobar and across the Kingdom: reinforced concrete and block walls, precast panel walls, retaining walls, gates and fencing. Wind and earth pressure follow SBC 301, and handover includes wall drawings, material test records and as-builts.

Waterproofing Systems

Waterproofing Systems

NLS Contractors installs waterproofing for basements, podium decks, roofs, wet areas and tanks in Riyadh, Jeddah, Dammam, Khobar and across the Kingdom, using bituminous sheet, polyurethane or cementitious systems. A flood test is recorded before covering, and handover includes system data sheets, test records and any warranty the contract requires.

Site Preparation & Earthworks

Site Preparation & Earthworks

NLS Contractors carries out site preparation and earthworks packages in Riyadh, Jeddah, Dammam, Khobar and across the Kingdom: clearing, cut and fill, excavation including hard strata, dewatering, imported select fill and compaction tested to modified Proctor ASTM D1557. Handover includes survey levels, compaction test results and as-built levels.

Concrete Foundations & Slabs

Concrete Foundations & Slabs

NLS Contractors builds isolated, strip and raft foundations and ground slabs in Riyadh, Jeddah, Dammam, Khobar and across the Kingdom, with reinforcement, formwork and pours to ACI 318 and ready-mix to ASTM C94. Handover includes pour records, cube test results, rebar inspection records and as-builts.

Reinforced Concrete Frames & Structures

Reinforced Concrete Frames & Structures

NLS Contractors builds reinforced concrete frames in Riyadh, Jeddah, Dammam, Khobar and across the Kingdom: columns, beams, slabs, shear walls, stairs and tanks, with formwork, rebar fixing and curing. Loads follow SBC 301, detailing follows ACI 318, and handover includes inspection records, test results and as-builts.

Available in

Get in touch

Send us your RFQ

Tell us what you need and we will come back with pricing and lead times.

+966 53 590 8101