Pre-Engineered Steel Buildings (PEB) (Steel Warehouses & Hangars)
Also called: PEB supplier, PEB contractor, pre-engineered metal building, steel warehouse building, steel hangar, prefab steel building
NLS Contractors supplies and erects pre-engineered steel buildings for warehouses, factories, hangars and showrooms in Riyadh, Jeddah, Dammam and Khobar. Frames are built-up tapered sections with cold-formed purlins and sheeting, designed to MBMA, AISC 360 and AISI S100 with SBC 301 loads. Handover includes anchor bolt plans, erection drawings, material certificates and as-builts.
A pre-engineered building is a steel building designed as a system by its maker. The primary frames are built-up I-sections, deep where the bending moment peaks and slim where it does not, which is why they look tapered. Cold-formed Z or C purlins and girts carry the roof sheeting and wall cladding, and bracing keeps the frame square. The result suits warehouses, factories, hangars and showrooms where the plan is a simple rectangle and the span is long.
Design follows the MBMA Low Rise Building Systems Manual, AISC 360 for the primary frames and AISI S100 for the cold-formed members, with loads per SBC 301. The design wind speed and any collateral loads belong on the enquiry: lighting, sprinkler pipework, ducts, and solar panels on the roof. A roof sized for sheeting alone will not carry a PV array later without strengthening.
Options move the price more than the frame does. Clear span or interior columns, insulated roof and wall panels or single skin with a liner, skylights, roof ventilators, mezzanines, canopies, and crane beams. Crane runway beams need their own design, so give the crane capacity and duty class at the start.
PEB wins on programme and steel weight where the geometry is regular. Conventional rolled-section steel wins on heavy cranes, multi-storey plans and irregular shapes. If the consultant's scheme is conventional, the offer can price it as drawn and add a PEB alternative for comparison, with the differences listed.
The anchor bolt plan is the first drawing the civil team needs, because the base reactions on it set the foundation design and the bolt positions. It is issued early, and the as-built survey of the bolts is requested before erection starts. Erection then proceeds bay by bay with a crane, bolted connections, and a check of plumb and level at each stage. Foundations are a separate concrete package, quoted alongside on request.
Price depends on building width, length and eave height, roof slope, design wind speed, crane loads, insulation and the cladding specification. Lead time depends on that scope and the offer states it. Send the plan and section, the design loads, the finish specification and the site city.
Specifications
- ✓Frames: built-up tapered I-section primary frames, clear span or with interior columns
- ✓Secondary members: cold-formed Z or C purlins and girts to AISI S100
- ✓Design: MBMA Low Rise Building Systems Manual, AISC 360, loads per SBC 301
- ✓Envelope: single skin or insulated panels, skylights, roof ventilators, canopies
- ✓Options: crane beams, mezzanines, partition walls where specified
- ✓Handover: anchor bolt plans, erection drawings, material certificates, as-builts
Frequently Asked Questions
What does a PEB quote need from me?+
Building width, length and eave height, roof slope, the design wind speed and load basis, any crane capacity, insulation and cladding requirements, door openings and the site city. A plan, a section and the finish specification are enough to start.
Can a PEB carry an overhead crane?+
Yes, if it is designed for one. The runway beams and the frames that support them are sized for the stated capacity and duty class, so the crane details must be on the enquiry. A crane added later usually means checking and strengthening the frames.
Can solar panels be added to a PEB roof?+
Yes, provided the roof is designed for the added load. State the PV weight and layout at enquiry so the purlins and frames are sized for it from the start.
Who builds the foundations for a PEB?+
Foundations are a separate concrete package. The PEB design issues the anchor bolt plan and base reactions, and the offer can include the foundations or coordinate with the client's own concrete contractor.
Is NLS Contractors a PEB supplier in Saudi Arabia?+
NLS Contractors takes pre-engineered steel buildings as a supply and erect works package, not as a supply-only sale. The frames, purlins and sheeting come from a specialist PEB manufacturer's quote, designed to MBMA, AISC 360 and AISI S100 with SBC 301 loads, and the offer states the erection scope, the foundation interface and the handover documents.
Who supplies Pre-Engineered Steel Buildings (PEB) (Steel Warehouses & Hangars) in Saudi Arabia?+
NLS Contractors (Northlane Solutions Company) supplies Pre-Engineered Steel Buildings (PEB) (Steel Warehouses & Hangars) across Saudi Arabia, including Riyadh, Jeddah, Dammam and Jubail. Send your specification and quantities to info@nlscontractors.com or info@northlanesolution.com for a quotation.
Related products

Mezzanines & Access Platforms
NLS Contractors supplies and installs steel mezzanine floors and access platforms in warehouses, factories and plant rooms in Riyadh, Jeddah, Dammam and Khobar. Scope covers columns, beams, decking, stairs, handrails and gates, designed for live loads under SBC 301 and the actual use. Handover includes shop drawings, a calculation summary, load plaque details and as-builts.

Solar Mounting Structures
NLS Contractors supplies and installs solar mounting structures for ground-mount and rooftop PV arrays in Riyadh, Jeddah, Dammam and Khobar and across the Kingdom. Galvanised posts and rails sit on piles, ground screws or concrete footings, designed for SBC 301 wind uplift and IEC 62548. Handover includes foundation drawings, galvanising certificates, pile test records and as-builts.

Roof & Wall Cladding Installation
NLS Contractors installs roof and wall cladding on steel frames in Riyadh, Jeddah, Dammam and Khobar: single skin sheeting, insulated sandwich panels with PU, PIR or rockwool cores, standing seam roofs, flashings, gutters and skylights. Checks cover fire behaviour, wind uplift, water tightness and SBC 601 thermal values. Handover includes panel layouts, a fixing schedule and a water test record.

Structural Steel Fabrication & Erection
NLS Contractors delivers structural steel packages in Riyadh, Jeddah, Dammam and Khobar and across the Kingdom: columns, beams, trusses and bracing, from shop drawings through coating and erection. Design follows AISC 360 with loads per SBC 301, and welding follows AWS D1.1. Handover includes mill certificates, weld maps, NDT and coating records, and as-built drawings.