Helipad Drainage & Firefighting Provisions

Helipad Drainage & Firefighting Provisions

Helipad drainage and firefighting provisions cover surface drainage with fuel containment, hose reels, extinguishers, hydrants or foam provisions, and rescue equipment storage. The provision level is set by the owner and Civil Defense, with NFPA 418 and ICAO Annex 14 Volume II guidance, in Riyadh, Jeddah, Dammam and Khobar. Handover includes drainage and fire drawings, pressure test records and as-builts.

A helipad stores a lot of energy in a small footprint: a fuelled aircraft, a hot engine, and sometimes a patient being moved in a hurry. Drainage and firefighting provisions are what limit the consequence of a spill or a fire, and they are built into the pad, not added later. NLS Contractors prices them as a works package covering installation, testing and handover.

Drainage is the quieter half. The pad surface is graded to drain, and fuel that spills on it should not run toward the building or into the storm network unchecked. The drainage scope therefore includes surface channels or gullies, an interceptor or containment arrangement for fuel as the design shows, and an outfall to the approved point. On a ground-level pad this is a civil question of falls and pipework. On a rooftop pad it is also a building services question, because the drainage has to be routed through the building, and the roof structure must be protected from spilled fuel.

Firefighting provisions depend on what the owner and Civil Defense require. NFPA 418 covers heliports, and ICAO Annex 14 Volume II gives rescue and firefighting guidance. The provision level is not set by the contractor. It may be as simple as extinguishers and hose reels at the pad, or it may include hydrants on a fire main, a foam provision, and a store for rescue equipment near the landing area. The offer follows the approved fire drawings and lists each item by type and quantity.

Rooftop specifics need care. A fire main connection has to reach the roof, with isolating valves and pressure suited to the hose reels or hydrants served. The roof structure under the pad is protected where the design requires it, and routes from the pad to the stair and the emergency department stay clear.

Testing is recorded. Drainage lines are water or air tested, and fire mains are pressure tested and flushed. Civil Defense inspects the completed provisions, and the contractor supports that inspection with drawings, test records and equipment datasheets.

Handover includes drainage and fire drawings, pressure test records, Civil Defense inspection support documents and as-builts. To price it, send the fire and drainage drawings, the specification clauses, the Civil Defense comments and the BOQ. Price and lead time depend on the scope, and the offer states both.

Specifications

  • ✓Surface drainage with fuel containment and an outfall to the approved point
  • ✓Hose reels, extinguishers, hydrants or foam provisions, and rescue equipment storage
  • ✓Standards: NFPA 418, ICAO Annex 14 Volume II guidance; provision level set by the owner and Civil Defense
  • ✓Rooftop specifics: drainage routed through the building, fire main connection, roof structure protection
  • ✓Handover: drainage and fire drawings, pressure test records, Civil Defense inspection support, as-builts

Frequently Asked Questions

Who decides the firefighting level for a helipad?+

The owner and Civil Defense, through the consultant's fire design. The contractor installs what the approved fire drawings show and supports the Civil Defense inspection.

How is spilled fuel kept off the building?+

The pad is graded to channels or gullies leading to a containment arrangement, then to an approved outfall. On a rooftop the drainage is routed through the building so fuel does not reach the roof edge or the facade.

What tests are recorded on the fire and drainage works?+

Water or air tests on drainage lines, and pressure tests and flushing on fire mains. Records go to the consultant and support the Civil Defense inspection.

Who supplies Helipad Drainage & Firefighting Provisions in Saudi Arabia?+

NLS Contractors (Northlane Solutions Company) supplies Helipad Drainage & Firefighting Provisions across Saudi Arabia, including Riyadh, Jeddah, Dammam and Jubail. Send your specification and quantities to info@nlscontractors.com or info@northlanesolution.com for a quotation.

Related products

GACA Approval Support for Helipad Construction

GACA Approval Support for Helipad Construction

GACA approval support for helipad construction assembles the construction-side documents behind the owner's GACAR Part 138 submission: drawings, obstacle surface inputs, lighting and marking datasheets, inspection records and as-builts. Approval belongs to the owner through the consultant. Delivered as one indexed document set for projects in Riyadh, Jeddah, Dammam and Khobar.

Ground-Level Helipad Construction

Ground-Level Helipad Construction

Ground-level helipad construction covers the FATO, TLOF and safety area, a bearing pavement in reinforced concrete or asphalt, shoulders, drainage, perimeter fence and access. Geometry follows GACAR Part 138, ICAO Annex 14 Volume II and FAA AC 150/5390-2C for the owner's design helicopter, anywhere in the Kingdom, with drawings, test records and a handover pack for the GACA submission.

Hospital Rooftop Helipads

Hospital Rooftop Helipads

Hospital rooftop helipad construction covers the structural interface to the roof slab or frame, the TLOF surface, safety net, access route to the emergency department, lighting and firefighting provisions. Built to GACAR Part 138, ICAO Annex 14 Volume II, NFPA 418 and Civil Defense requirements in Riyadh, Jeddah, Dammam and Khobar, with load path documentation and a handover pack.

Elevated Helidecks (Steel Structure)

Elevated Helidecks (Steel Structure)

Elevated helideck construction covers the steel support structure, deck plating in steel or aluminium, connections, foundations, perimeter safety netting and access stairs. Design uses helicopter loads, with wind and seismic per SBC 301 and deck geometry per ICAO Annex 14 Volume II. Fabrication follows AISC 360 and AWS D1.1, with mill certificates, weld and NDT records at handover.

Helipad Electrical & Lighting Installation

Helipad Electrical & Lighting Installation

Helipad electrical and lighting installation covers perimeter lights, floodlights, FATO and approach lights, the lit wind direction indicator, obstruction lights, power supply, control panel and backup. Installed to ICAO Annex 14 Volume II visual aids, GACAR Part 138 and FAA AC 150/5390-2C, with IEC 62305 earthing where specified. Handover includes circuit test records, function tests, as-builts and O&M manuals.

Guides

Available in

Get in touch

Send us your RFQ

Tell us what you need and we will come back with pricing and lead times.

+966 53 590 8101